Build advances design intelligence into delivery certainty.

Overview

Programme, cost and supply chain each ask you to give something up. Without a system, what gets given up is whatever nobody happened to be watching that week. Build keeps the reference design as the reference: packages are structured from the model, change is tracked as deviation from a decision rather than as an untraceable variation, and the scheme that gets built is the one that was approved.

Overview

Programme, cost and supply chain each ask you to give something up. Without a system, what gets given up is whatever nobody happened to be watching that week. Build keeps the reference design as the reference: packages are structured from the model, change is tracked as deviation from a decision rather than as an untraceable variation, and the scheme that gets built is the one that was approved.

A coordinated delivery system that protects design intent from model to site.

[01]

BIM / VDC delivery management

Federated models across disciplines, with clashes and interfaces resolved before they reach site.

[02]

WBS package management

Work broken into packages that match how the supply chain bids, structured from the model rather than from the drawings.

[03]

Supply chain integration

Europe's major prefabricators and specialist data centre suppliers held in the model, with buildability and lead time priced before tender.

[04]

Digital procurement support

Scope, specification and model data issued together, so returns are comparable rather than interpretive.

[05]

CSA construction information production

Package-level information produced to the standard site needs, at the speed it needs it.

[06]

Design change and interface control

Every change measured against the reference design, with its consequence visible before it's accepted.

A coordinated delivery system that protects design intent from model to site.

[01]

BIM / VDC delivery management

Federated models across disciplines, with clashes and interfaces resolved before they reach site.

[02]

WBS package management

Work broken into packages that match how the supply chain bids, structured from the model rather than from the drawings.

[03]

Supply chain integration

Europe's major prefabricators and specialist data centre suppliers held in the model, with buildability and lead time priced before tender.

[04]

Digital procurement support

Scope, specification and model data issued together, so returns are comparable rather than interpretive.

[05]

CSA construction information production

Package-level information produced to the standard site needs, at the speed it needs it.

[06]

Design change and interface control

Every change measured against the reference design, with its consequence visible before it's accepted.

↓ What protects intent through delivery
↓ What protects intent through delivery

[01]

The standard

The reference design stays the benchmark. Deviations are decisions, made deliberately and recorded.

[01]

The standard

The reference design stays the benchmark. Deviations are decisions, made deliberately and recorded.

[02]

The information

One model, one source. Packages, revisions and queries all resolve back to the same place.

[02]

The information

One model, one source. Packages, revisions and queries all resolve back to the same place.

[03]

The consent

What was approved stays what gets built. Post consent drift is a planning risk as much as a design one.

[03]

The consent

What was approved stays what gets built. Post consent drift is a planning risk as much as a design one.

[04]

The intent

Senior people stay on the programme through delivery. Judgement doesn't get handed to someone reading it cold.

[04]

The intent

Senior people stay on the programme through delivery. Judgement doesn't get handed to someone reading it cold.

Let's build it right.